Hopp til innhold

Sofia Electric 6 Months Behind Schedule Imperial Stout 2023

Sofia Electric Brewing Kommersielt Utgått
Dette ølet finnes ikke lenger i Vinmonopolets sortiment.

8H – Imperial stout

Tilleggsutvalget

Polslipp Tilleggsutvalget Desember 2023 Tilleggsutvalget August 2023

Our strongest core range beer has gotten stronger this year weighing in at a hefty 10% ABV. Like every year we change the recipe while keeping the same fundamentals, which is a non adjunct/no nonsense imperial stout where the malt and yeast does all the talking. Coffee, dark and milk chocolate along with dark fruits dominate the beer with hints of soy sauce and caramel to round it off. Keep at or below cellar temperatures and best enjoyed at 12-14C. Cheers/ Наздраве! 2022 version: https://untappd.com/b/sofia-electric-brewing-6-months-behind-schedule-2022/4743513

Aroma: Duft av sjokolade, kaffe, vanilje.

Smak: Smak av sjokolade, vanilje, kaffe.

– Ingen vurderinger ennå 0 vurderinger Vurder ølet
– Ikke bedømt

Stil-analyse

ABV
10 %
Stilens område: 7–12 %
IBU
40
Stilens område: 50–90

Kommentarer

  • Ingen kommentarer ennå.

Logg inn for å kommentere

Bli med i fellesskapet — det er gratis.

Kommentarfeltet er stengt.
Bli med i fellesskapet

Logg inn eller opprett en gratis konto for å vurdere, kommentere og følge andre bryggere.

Bli med på Dommerbordet. Det er gratis.

Som gjest ser du bare en del av det som skjer her. Med en gratis konto kan du også:

  • Gi stjerner og skrive vurderinger av øl du smaker
  • Få varsel når et øl kommer på lager på ditt pol
  • Følge bryggerier og bryggere, kommentere og diskutere
  • Dele hjemmebrygget ditt og få tilbakemelding fra sertifiserte dommere
Opprett gratis konto

Har du konto? Logg inn